UWSS Chittorgarh Location: Chittorgarh City Client: PHED Rajasthan. Sector: Urban Water Supply Scheme Starting Date: 2018 Project Brief: There is a wide gap in the infrastructure available and that required to meet the present demand in the towns. The necessity of this project is due to lower service levels, low pressures, small duration, uncovered area, and poor asset conditions. To solve the drinking water problems in Chittorgarh, it is proposed to extend & reinforce the existing transfer system to various service reservoirs, construct new CWRs & OHSRs, laying of new transfer mains, etc. The existing distribution network will be strengthened and a new distribution system is proposed to be laid in uncovered areas....

UWSS Bikaner Location: Bikaner City Client: PHED Rajasthan. Sector: Urban Water Supply Scheme Starting Date: 2018 Project Brief: The design period of the water supply scheme is the year 2045. Over 750000 people of Bikaner City will be benefited from this project. The primary objective of the proposed project is to provide safe & potable drinking water to the Bikaner City of Bikaner District. Another important objective is to create a sustainable infrastructure for drinking water supply in the project area, improve health, reduction in instances of waterborne diseases in the targeted population, and the reduction in hardships especially for the women & underprovided section of society....

Arsenic/Fluoride removal UP Location: Prayagraj, Mirzapur, Chitrakoot, Jhansi, Devipatan, Faizabad UP Client: UP Jal Nigam. Sector: Solar power based Arsenic / Fluoride Removal Projects Starting Date: 2020 Project Brief: The complete work consists of a bore-well (source of raw water), SPV and solar pump, 3 stage overhead structure, raw/ treated water, HDPE storage tank of 5000-liter capacity, Arsenic/ Fluoride removal units, and other related works for proper distribution of treated water....

STP Moradabad Location: Moradabad Town Client: NMCG / UPJN Uttar Pradesh. Sector: Sewage Treatment Plant Starting Date: 2020 Project Brief: The government of India has approved the Namami Gange program as an integrated approach for effective abatement of pollution in the river Ganga. As part of this and to ensure that no untreated domestic sewage flows into the river Ganga, various interventions are planned such as interception & diversion works and development & operation of sewage treatment plants (STPs). Considering various development models in practice for the construction, operation, and maintenance of STPs, the government of India has approved the Hybrid Annuity-based Public-Private Partnership (PPP) model as one of the options for the development & operation of STPs. Under this model, a private investor/developer will design, build, finance, operate, and transfer the asset (STP) to the Project Executing Agency / UP Jal Nigam at the end of the concession period (say 15 years). 40% of the capital cost will be paid to the developer during the construction of the STP. Balance 60% along with Operation & Maintenance (O&M) cost will be paid over the concession period on a quarterly basis on the achievement of key performance indicators as per the contract. Interest shall be payable on the reducing balance of 60% of the completion cost for the relevant facility, at the rate of the SBI MCLR plus 3% per annum. Such interest shall be due and payable quarterly along with each installment of the capex annuity. The entire cost of development and operation of the STPs will be 100% funded by the government of India as a central sector scheme. There is a proposed 25 MLD STP. After treating sewage effluent water will discharge into Ram Ganga River (Tributary of Ganges)....

STP Budhana-Muzaffarnagar Location: Budhana Town & Muzaffarnagar Town Client: NMCG / UPJN Uttar Pradesh. Sector: Sewage Treatment Plant Starting Date: 2020 Project Brief: The government of India has approved the Namami Gange program as an integrated approach for effective abatement of pollution in the river Ganga. As part of this and to ensure that no untreated domestic sewage flows into the river Ganga, various interventions are planned such as Interception & Diversion works and the development & operation of Sewage Treatment Plants (STPs). Considering various development models in practice for the construction, operation, and maintenance of Sewage Treatment Plants, the government of India has approved the Hybrid Annuity based Public-Private Partnership (PPP) model as one of the options for the development & operation of STPs. Under this model, a private investor/developer will design, build, finance, operate, and transfer the asset (STP) to the Project Executing Agency / UP Jal Nigam at the end of the Concession Period (say 15 years). 40% of the Capital cost will be paid to the developer during the construction of the STP. Balance 60% along with Operation & Maintenance (O&M) cost will be paid over the Concession Period on a quarterly basis according to the achievement of key performance indicators mentioned in the contract. Interest shall be payable on the reducing balance of 60% of the completion cost for the relevant Facility, at the rate of the SBI MCLR plus 3% per annum. Such interest shall be due and payable quarterly along with each installment of the Capex Annuity. The entire cost of development and operation of the STPs will be 100% funded by the government of India as a central sector scheme. Pollution abatement of river Ganga has been identified as a major step in fulfilling the mandate of the National Mission for Clean Ganga under the Namami Gange Program. Budhana is located on the banks of the river Hindon. At present, there is no sewerage facility available in Budhana and Muzzafarnagar. Therefore, all the sewage generated in the city is finding its way into open drains. There are three drains in Budhana town and Muzzafarnagar town carrying wastewater and they pollute the river directly. There are three proposed SBR based STPs i.e. 32 MLD, 22.5 MLD & 10 MLD....

Drinking Water Supply (Solar) Location: Karauli, Sawaimadhopur, Bharatpur, Dausa, Jhunjhunu, Sikar, Kota, Bundi, Baran, Jhalawar, Jaipur, Udaipur Client: PHED Rajasthan. Sector: Solar Based Water Supply Projects Starting Date: 2020 Project Brief: GA Infra design, provide, install solar-based pumping units with PSP units. GA Infra has installed more than 300 units of 1 HP to 20 HP capacity of solar-based pumping units in various parts of Rajasthan. GA Infra has commissioned the first-ever solar-based pump house on the India Pakistan border at Jaisalmer. Through these plants, the people of Rajasthan are getting water at a place where even electricity has not reached. In this project, GA Infra has the order to install more than 850 plants in various geographical locations across Rajasthan....

Solar DFU Projects Location: Karauli, Sawaimadhopur, Bharatpur, Jodhpur, Pali, Sirohi, Jalore Uadipur Client: PHED Rajasthan. Sector: Solar Based Water Supply Starting Date: 2020 Project Brief: GA Infra manufacture and supply De-Fluoridation units for the fluoride affected areas. GA Infra De-Fluoridation unit is available on media-based (Bio F/AA) and also with Automatic Fluoride Removal Unit (ARFU) (approved by MNIT) based on electrocoagulation. GA Infra De-Fluoridation unit has the capacity to reduce fluoride to 0.5 PPM even from 15 PPM fluoride content in raw water. They have rapidly installed more than 2500 units of 1000 LPH capacity to date and we are running these units successfully in various parts of the country. These De-Fluoridation units can work with or without conventional electricity and be clubbed with solar energy-based pumps to provide disruption-free, end-to-end solutions to the consumers. In this project, GA Infra has orders to execute more than 2500 units of 1000 LPH capacity....

RWSS Mahauri UP Location: Mirzapur, UP Client: SWSM UP. Sector: Rural Water Supply Scheme Starting Date: 2020 Project Brief: This scheme is under the Jal Jeevan Mission. The objective of the project is to provide drinking water through the pipe system to every household under the project area. Through this project, a total of 129 villages will be benefited. Under this water supply scheme, both surface-based water supply (31 villages) & tube-well based water supply (98 villages) is used. There is a scope to construct the 8 MLD WTP and associated ancillary activities....

RWSS Sri Ganganagar Location: Ganganagar Rural Client: PHED Rajasthan. Sector: Rural Water Supply Scheme Starting Date: 2018 Project Brief: There are 27  villages that are covered in this water supply scheme. Every scheme covered under this package is based on canal water available through Gang canal and Bhakhra canal. The works included in this package are for the improvement of water supply under existing canal water-based Rural Water Supply schemes under the division Sri Ganganagar....

RWSS Deeg Nagar Location: Deeg Rural & Nagar Rural Client: PHED Rajasthan. Sector: Rural Water Supply Project Starting Date: 2018 Project Brief: A total of 283 villages of Deeg & Nagar tehsils is proposed to be covered under this project. Any new revenue villages created after the 2001 census, from over & above of 283 villages shall also be treated separately and covered under this work, with the construction of the separate Village Transfer Chamber (VTC). All other habitations of the above villages shall also be covered. In this project, 8  Clear Water Reservoir with a total capacity of 3700 KL, 7 pumping stations, construction of 62 Elevated Service Reservoirs (ESR), and 1700 km pipeline has been laid....